I suspect that this would be a characteristic of all inverters to a greater or lesser extent. Depending on the extent of the load change and export overshoot this can vary from a few cycles to a few seconds. So when things change there is a short period of export until the electronics detect this and back off production back "towards" zero. Its only once you are exporting that you can pull in the reigns and stop generating power. Stopping exporting is essentially the same thing. They are reactionary, they only activate and do something about it once a problem is detected. EMalahleniBuy conlog prepaid meter manual Prepaid Electricity Online Example Eskom Tshwane. That same theory tells us that a control loop cannot work (be closed) unless there is a small error. EMalahleni Conlog prepaid meter manual: User’s review: City Power and many more Conlog Product Offering.We provide a holistic end-to-end solution that comprises of various products Conlog we support 99 of SA software and services. A construction manual and full blueprints are provided for each. Monitoring the flow of power and controlling it to meet a parameter are cornerstones of control loop theory. We offer free custom design services and package estimates, site con- LOG PROFILES. That cause the pre-paid meter to disconnect power for 30 seconds. My pre-paid meter is very sensitive for reverse current, so if there is a large shift in power, like a kettle switching off, the system can export power for a short time. Is anyone using a pre-paid meter with an inverter.Įvidently even though export is set to Zero when the load suddenly drops the inverter can export to the meter causing the meter to switch off power.
0 Comments
Leave a Reply. |